Home> News> Surface Treatment of Basin Faucets or Kitchen Faucets, and Shower Set
December 29, 2021

Surface Treatment of Basin Faucets or Kitchen Faucets, and Shower Set

Color plating Procedure of Basin Faucets or Kitchen Faucets, and Shower Set

Pre-treatment before color plating
1.Zinc alloy, plastic : Copper and Matt nickel plating
2.Brass part : wheel polishing

A.Brushed nickel:
1.Brushed finish treatment
2.Ultrasonic degrease deoil and wax 30s
3.Nickel plating - Oven baking at 120 °C for 40 minutes
4.Sealing oil
5.Drying at 120 °C for 40-60 minutes

B.Brushed gold:
1.Ultrasonic degrease deoil and wax 30s
2.Plating thickness imitation gold for 30 mins
3.Oven baking at 120 °C for 40 minutes
4.Brushed finish
5.Sealing oil
6.Drying at 120 °C for 40-60 mins

C. Brushed gun black:
1. Brushed finish treatment
2. Ultrasonic degrease deoil and wax 30s
3. Plating gun color for 30 mins
4. Oven baking Oven baking at 120 °C for 40 minutes
5. Sealing oil
6. Drying at 120 °C for 40-60 mins

D. Brushed rose gold:
1. Ultrasonic degrease deoil and wax 30s
2. Plating thick nickel for 30 mins
3. Oven baking at 120 °C for 40 minutes
4. Brushed
5. Sealing oil
6. Drying at 120 °C for 40-60 mins


Matt Black/white Finish Painting Procedure


A.Brass part
1.Sanding piece, #600 buffing wheel
2.Pre-treatment before plating - ultrasonic degrease for 3 minutes-cleaning in tank for 1 minute - ultrasonic degrease for 3 minutes - cleaning in tank for 3 minutes - chromic acid activation in tank 1 minute -chromic acid recovery neutralization 2 minutes - cleaning in tank 3 minutes.
3.Water washing 1 minute.
4. Drying (120℃±10℃ 10minutes) - Packaging.
5. Brush finish treatment.
6.Spraying pre-treatment- ultrasonic deoil & wax 60`s - cleaning in tank - passivation pool 20s-pure pool40`s times - Ultrasonic pool 20`s- air gun drying.
7.Alcohol test brush
8.Oven baking (120℃ 30 minutes)
9.Block with plug
10.Dust removal.

11.Spray primer.
12.Spray topcoat.
13.Curing (180℃±5℃ 60minutes)

B.Zinc alloy, plastic, stainless steel
1.Acid copper plating
2.Acid copper chemical blackening (blackening time 10 minutes)
3.Oven drying (75℃ 40minutes)
4.Spray pretreatment (cleaning in tank) – ultrasonic deoiling 60 seconds – tap water tank leaching 20 seconds 4 times – passivation tanks 20 seconds –pure water immersion 20 seconds 2 times – Ultrasonic pool 20 seconds – air gun drying
5.Oven baking (zinc alloy parts / stainless steel parts: 120℃ 30 minutes) ( plastic parts: 75℃ 30 minutes ) ( plastic parts have low melting point and baking temperature should not be higher than 75℃)
6.Dust removal
7.Spray primer
8.Spray topcoat
9.Curing furnace baking (zinc alloy parts / stainless steel parts: 140℃ 40 minutes) (plastic parts: 75℃ 40 minutes)
Share to:

LET'S GET IN TOUCH

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send